Below Grade Waterproofing
Membranes and drainage on foundation walls, footings, elevator pits and planters, installed before backfill so groundwater never reaches the basement or the parking levels.
Six systems, one envelope. Below grade to roof line, on residential, commercial and multi family properties.
A building keeps water out the way a jacket does, as one continuous skin. Break it anywhere and the water travels until it finds somewhere to show up, which is rarely where it got in.
That is why we scope a roof, a balcony deck, a below grade wall and the air barrier behind the cladding as parts of the same system rather than as four separate trades.
Everything under the finished grade line, where water sits under pressure and there is no second chance once the backfill goes in.
Membranes and drainage on foundation walls, footings, elevator pits and planters, installed before backfill so groundwater never reaches the basement or the parking levels.
The vertical envelope, from the sheathing outward. Air, water and building movement all have to be handled in the same assembly.
The parts of the envelope you can see: parapets, planters and balcony to wall transitions, plus the sheet and fluid applied air and weather barriers that run behind the cladding.
Joint systems that let a building move without tearing the waterproofing, from sealant joints in a wall to engineered joint covers across a garage deck.
Horizontal surfaces take the weather and the traffic at the same time, which is why they are usually the first thing to fail.
Waterproof deck systems for balconies, walkways and podium decks, applied over plywood or concrete, and traffic bearing membranes for parking structures, ramps and plaza decks that take tire wear and turning loads without splitting at the joints.
Epoxy floor systems for garages, mechanical rooms and back of house areas, laid over prepared concrete for a hard surface that cleans down easily.
None of the above holds over concrete that is coming apart, so the repair comes first.
Repair of spalled, cracked and delaminated concrete, including corroded reinforcing steel, so the substrate is sound before any coating goes over it.
Most calls start with a stain on a ceiling and end up being a detail two floors away. Send us the address and what you are seeing, or call and talk it through.