KCJ Contracting Inc

Waterproofing and building envelope contractor in Los Angeles, CA. KCJ Contracting Inc. Serving Los Angeles and Ventura County, including the San Fernando and Santa Clarita Valleys.

Los Angeles, CA · Since 1988

Protecting all six sides of a structure

Building envelope waterproofing across Los Angeles and Ventura County, on new construction and on restoration. Below grade, decks, above grade waterproofing and roofing, scoped as one continuous system.

1988 Waterproofing Los Angeles since
6 Sides of the structure we protect
6 Envelope systems we install
546580 CSLB licence, bonded and insured
What we install

Below grade to roof line

We work on new construction alongside the builder and on restoration, across residential, commercial and multi family properties.

Waterproofing membrane installed on a below grade foundation wall before backfill, with structural steel above
01

Below Grade Waterproofing

Membranes and drainage on foundation walls, footings, elevator pits and planters, installed before backfill so groundwater never reaches the basement or the parking levels.

Details
Finished waterproof deck coating on a balcony beside a glass wall with an ocean view
02

Deck/Traffic Coating

Waterproof deck systems for balconies, walkways and podium decks, applied over plywood or concrete, and traffic bearing membranes for parking structures, ramps and plaza decks that take tire wear and turning loads without splitting at the joints.

Details
Above grade waterproofing being spray applied to an exterior wall from scaffolding
03

Above Grade Waterproofing

The parts of the envelope you can see: parapets, planters and balcony to wall transitions, plus the sheet and fluid applied air and weather barriers that run behind the cladding.

Details
KCJ Contracting installer trowelling an epoxy coating into a corner detail
04

Epoxy Coatings

Epoxy floor systems for garages, mechanical rooms and back of house areas, laid over prepared concrete for a hard surface that cleans down easily.

Details
Plywood deck with every seam and fastener taped before the waterproofing membrane goes on
05

Expansion Joints

Joint systems that let a building move without tearing the waterproofing, from sealant joints in a wall to engineered joint covers across a garage deck.

Details
Concrete stair and landing restored and waterproofed inside a framed structure
06

Concrete Restoration

Repair of spalled, cracked and delaminated concrete, including corroded reinforcing steel, so the substrate is sound before any coating goes over it.

Details

Custom sheet metal is an essential part of reinforcing transitions in planters, decks and similar details.

One continuous skin

Water finds the one detail nobody thought about.

A building keeps water out the way a jacket does. Break it anywhere and the water travels until it finds somewhere to show up, which is rarely where it got in. So we scope a roof, a balcony deck, a below grade wall and the air barrier behind the cladding as parts of the same system, not as four separate trades.

The building envelope

All six sides of the structure.

KCJ Contracting has been protecting the building envelope in Los Angeles since 1988. We work on residential, commercial and multi family properties, from below grade and above grade waterproofing to deck coatings and roofing.

Water finds the one detail nobody thought about. So we treat the envelope as one continuous system and cover all six sides of a structure, rather than chasing a leak and leaving the next one to somebody else.

Licensed, bonded and insured. CSLB License #546580.

More about the company
Two KCJ Contracting crew members on a completed below grade waterproofing membrane
Two KCJ Contracting crew members checking a flood test on a below grade slab
Six sides

Every surface between you and the weather.

The envelope is the roof, the four walls and everything below grade. That is the six sides. It is why a below grade membrane, a balcony deck coating and an air barrier all belong to the same job on our sites.

We work on new construction alongside the builder and on existing buildings where something has already failed. Both start with the same walk around the building.

Fig. 01 Building envelope Section
Roof Walls Below grade
Roof, four walls and everything below grade. Break the line anywhere and the water is inside the envelope.
Custom home fully wrapped in a weather resistive barrier before cladding
Built A custom home closed in on all six sides, weather barrier lapped and flashed before any cladding goes on.
On site

Recent work

Progress photographs from custom residential and multi family projects across Los Angeles. Finished job photography is being added as projects close out.

KCJ Contracting installer applying waterproofing membrane on a hillside deck above the Pacific
Below grade waterproofing Below grade deck, hillside residence
Flood test holding water on a completed below grade waterproofing membrane above the Pacific
Below grade waterproofing Flood test before backfill
Waterproofing membrane installed on a below grade foundation wall before backfill, with structural steel above
Below grade waterproofing Membrane turned down to the footing
Modern custom home in Malibu wrapped and scaffolded for building envelope work
Above grade waterproofing Envelope work in progress
Weather resistive barrier installed on a Malibu residence with scaffolding and the Pacific behind
Above grade waterproofing Weather barrier, full elevation
Finished waterproof deck coating on a balcony beside a glass wall with an ocean view
Deck/traffic coating Finished deck coating at a glass wall
Self adhered air barrier panels installed across an exterior wall under the roof framing
Above grade waterproofing Air barrier across an exterior wall
How a job runs

Four steps, in order

The same sequence on a two day balcony and on a full below grade level. We strive to think ahead and plan for potentials to reduce the need for change orders.

Precon meeting

Precon meetings, the plans sent over or an electronic RFP, then we walk the project and come back with scope and prices.

Scope and price it

You get the system we intend to install, how the corners, penetrations and terminations are detailed, and what it costs.

Prep, then install

Substrate repair and drying come before any membrane. Most failures we are called to fix were installed correctly onto a surface that was not ready.

Inspect before it is covered

Below grade work gets signed off before backfill and, where it applies, flood tested. Once the soil or the topping slab goes on, nobody sees that membrane again.

On the map

Where we work

Ventura County, Santa Clarita Valley, San Fernando Valley, and across Los Angeles itself.

Browse the service area

Straight answers

Before you call

What does the building envelope actually cover?

The envelope is every surface between the inside of a building and the weather: the roof, the four walls and everything below grade. That is the six sides. It is why a below grade membrane, a balcony deck coating and an air barrier all belong to the same job on our sites.

Do you work on homes as well as commercial buildings?

Yes. We work on residential properties and on commercial and multi family buildings, from a single balcony deck to a full parking structure.

Do you repair the concrete before you coat it?

Yes. Spalled, cracked or delaminated concrete has to be cut out and made sound before a membrane goes over it, or the new coating fails at the same spot. Concrete restoration is part of the same scope on our jobs, not a second trade you have to hire.

What kind/size of projects do you work on?

Everything from a small residential repair, through full protection on a high end custom home, all the way up to new construction and repairs on mixed use, multi family and commercial buildings.

What warranties do you offer?

Typically a 5 year material warranty is standard, all the way up to a 20 to 30 year NDL warranty on certain projects.

Which areas do you cover?

Los Angeles and Ventura County, including the San Fernando Valley, the Santa Clarita Valley, the Westside and the beach cities. If you are not sure whether your address is in range, call and ask.

Get in touch

Send us the details.

Tell us the property, the address, and what you are seeing. If you would rather talk it through, the phone is quicker.

Where we work
Serving Los Angeles and Ventura County, including the San Fernando and Santa Clarita Valleys
Two KCJ Contracting crew members on a completed below grade waterproofing membrane Below grade membrane, signed off before backfill

By submitting, you agree KCJ Contracting Inc may call or email you about this request.

Call